A difference between project and continuous flow categories of process flow structures is which two of the following?


A) The size of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "Virtual Factory"
E) Profit per unit

F) B) and E)
G) B) and D)

Correct Answer

verifed

verified

Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.

A) True
B) False

Correct Answer

verifed

verified

A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.

A) True
B) False

Correct Answer

verifed

verified

In a workcenter, machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine, on which batches should machine B be used?


A) All batches should be run on machine B
B) Batches of more than 20 units should be run on machine B
C) Batches of fewer than 80 units should be run on machine B
D) Batches with up to 50 units should be run on machine B
E) No batches should be run on machine B

F) C) and E)
G) A) and B)

Correct Answer

verifed

verified

One trade-off illustrated by the product-process matrix is between flexibility and cost.

A) True
B) False

Correct Answer

verifed

verified

The term "assembly line" refers to progressive assembly linked by some material handling device.

A) True
B) False

Correct Answer

verifed

verified

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.

A) True
B) False

Correct Answer

verifed

verified

One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment, fixed costs, and variable costs is break-even analysis.

A) True
B) False

Correct Answer

verifed

verified

Give an example of a project layout.

Correct Answer

verifed

verified

A construction proje...

View Answer

The product-process matrix shows the relationship between process structures and product volume and variety characteristics.

A) True
B) False

Correct Answer

verifed

verified

Differentiate between a workcenter and a manufacturing cell.

Correct Answer

verifed

verified

These layout types are discussed on page...

View Answer

An example of an assemble-to-order firm is Dell Computer.

A) True
B) False

Correct Answer

verifed

verified

A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.

A) True
B) False

Correct Answer

verifed

verified

The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.

A) True
B) False

Correct Answer

verifed

verified

A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials.) It can make the part on a standard lathe for $250 per unit (also including materials.) It can make the part on a machining center for $50 per unit (also including materials.) The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit.

Correct Answer

verifed

verified

If the quantity required is less than 10...

View Answer

The time needed to respond to a customer's order is called the customer response time.

A) True
B) False

Correct Answer

verifed

verified

Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.

A) True
B) False

Correct Answer

verifed

verified

Describe the implications of the product-process matrix for process design in a competitive situation.

Correct Answer

verifed

verified

The product-process matrix on page 163 a...

View Answer

Which of the following is not considered a major process flow structure?


A) Work Center
B) Project
C) Assembly line
D) Fabrication
E) Continuous Flow

F) All of the above
G) D) and E)

Correct Answer

verifed

verified

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

A) True
B) False

Correct Answer

verifed

verified