The table containing the Learning Curve Coefficients allows one to calculate both the time it should take to build the nth unit as well as the total production time required to build the entire production run when the nth unit is the last one completed.

A) True
B) False

Correct Answer

verifed

verified

Consider the following information. Consider the following information.

Correct Answer

verifed

verified

(a) 49 for element 1, 14 for element 2, ...

View Answer

Which of the following is an advantage of specialization in job design?


A) high turnover rates
B) minimal training needed
C) intrinsic satisfaction of employees
D) increased opportunity for advancement of employees
E) low scrap rates

F) A) and C)
G) B) and C)

Correct Answer

verifed

verified

Jobs that are intrinsically satisfying to the employee are said to be ____________________.

Correct Answer

verifed

verified

behavioral...

View Answer

Which of the following is not a step in work sampling?


A) Estimate the proportion of time spent on the given activity.
B) Estimate the sample size based on the desired level of accuracy and confidence.
C) Define the activities to be observed.
D) Identify the worker or machine to be sampled.
E) Divide the job into basic elements.

F) None of the above
G) B) and C)

Correct Answer

verifed

verified

The degree to which an individual or group of individuals can physically and mentally handle the job is its technical feasibility.

A) True
B) False

Correct Answer

verifed

verified

In a time study, personal time, fatigue, and unavoidable delays (PFD) during the typical work day are accounted for in what?


A) the normal time
B) an allowance factor
C) the performance rating
D) how the work elements are defined
E) costs

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

Consider the following information. Consider the following information.     (a) Calculate the mean observed time for each work element. (b) Calculate the normal time for each work element. (c) Using an allowance factor of 15% based on the amount of time worked; calculate the standard time for each work element and for the entire job. (d) Based on the standard time, how many units should an employee performing at 120% of standard complete each hour? (a) Calculate the mean observed time for each work element. (b) Calculate the normal time for each work element. (c) Using an allowance factor of 15% based on the amount of time worked; calculate the standard time for each work element and for the entire job. (d) Based on the standard time, how many units should an employee performing at 120% of standard complete each hour?

Correct Answer

verifed

verified

(a) 4.82 for element 1, 8.28 for element...

View Answer

How many standard deviations is required for a 98% confidence level?


A) 2
B) 2.05
C) 2.17
D) 2.33
E) 2.58

F) A) and E)
G) B) and D)

Correct Answer

verifed

verified

What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?


A) increases
B) decreases
C) unchanged
D) may increase or decrease
E) impossible to say

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

Typically the job chosen for the time study will be a routine job that is labor intensive.

A) True
B) False

Correct Answer

verifed

verified

The first unit of a product took 400 hours to complete. If an 80% learning curve is expected, how long will it take to complete the first 18 units?


A) 157.6 hours
B) 163.8 hours
C) 400.0 hours
D) 3886.4 hours
E) 7200.0 hours

F) All of the above
G) B) and C)

Correct Answer

verifed

verified

Having waiters cook and having the cooks wait on tables is an example of ______________.


A) job enlargement
B) job rotation
C) job enrichment
D) job involvement
E) job enhancement

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

What are the ways that standard times can help in planning and scheduling?

Correct Answer

verifed

verified

make workload forecasts; plan ...

View Answer

The ____________ time is the time it should take a qualified operator, working at a sustainable pace and using the appropriate tools and process, to do the job.


A) performance
B) observed
C) normal
D) standard
E) ideal

F) All of the above
G) A) and B)

Correct Answer

verifed

verified

Describe why understanding learning curves is important to the organization.

Correct Answer

verifed

verified

Understanding learning curves is importa...

View Answer

Which of the following is a basic difference of work sampling compared to a time study?


A) It does not require any observations.
B) It requires fewer observations to accomplish the same thing.
C) It is better suited for short, repetitive tasks.
D) It does not provide standard times.
E) It is suitable only for assembly lines.

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

Which of the following is not a commonly used process for setting standard times?


A) elapsed times
B) time study
C) elemental time data
D) predetermined time data
E) work sampling

F) None of the above
G) A) and B)

Correct Answer

verifed

verified

Consider the following information. Consider the following information.     (a) Calculate the mean observed time for each work element. (b) Calculate the normal time for each work element. (c) Using an allowance factor of 10% based on job time; calculate the standard time for each work element and for the entire job. (d) Based on the standard time, how many units should an employee performing at 100% of standard complete each hour? (a) Calculate the mean observed time for each work element. (b) Calculate the normal time for each work element. (c) Using an allowance factor of 10% based on job time; calculate the standard time for each work element and for the entire job. (d) Based on the standard time, how many units should an employee performing at 100% of standard complete each hour?

Correct Answer

verifed

verified

(a) 2.73 for element 1, 3.22 for element...

View Answer

What are the approaches to eliminating employee boredom? Briefly describe each.

Correct Answer

verifed

verified

Job enlargement involves a horizontal ex...

View Answer

Showing 21 - 40 of 133